ANALISA RISIKO PEKERJAAN REHABILITASI JARINGAN IRIGASI DI.WARU KABUPATEN PENAJAM PASER UTARA PROVINSI KALIMANTAN TIMUR

AKHIRUDDIN ALI

Abstract


The risk is one of the things that can not be separated in daily live as well as the implementation of construkctions projeck did not separated with the risk. Irrigation canal is the unity of the cannals and the building which needed for the irrigation water settings, that starting from provision, water taking, division,water giving and water using of the problem the research with tittle “the risk analysis of rehabilitation of canals irrigation construction in DI. Waru panajam pasir utara district, east Borneo” Construction and what are how to identify the risk of rehabilitation the most influenced to the rehabilitation construction. The purpose of this study was to identifyed the risk in the rehabilitation construction and to analysied the risk that gives the most negative effect while the rehabilitation construction. Method of this study was quantitative and the souses of this study was quitioner and interview. The data would be analysed by peartson product moment and probability impact matrix method, and likert scale was the theoritical basis of this study. Based on data analysis, the research found that from 27 variables there was 23 variables was valid and 4 variable was not valid. the presentation from 4 variables that have high category was 17.5%.

Keywords


risk analysis, irrigation waru, pearson product moment, pobability impact matrix, likert scale

Full Text:

pdf

References


Asiyanto.2003. Construction Project Cost Management. Jakarta:

PT Pradnya Paramita

Ayunita, dan Cahyono. (2013). “Analisa Risiko Pada Proyek Pembangunan Underpass di

Simpang Dewa Ruci Bali”. Surabaya

Djojowirono, Soegeng. 2005. Manajemen Konstruksi. Yogyakarta:

Biro Penerbit KMTS FT UGM

Ervianto, I Wulfram. 2005. Manajemen Proyek Konstruksi.

Yogyakarta: CV Andi Offeset

Flanagan, R., & Norman, G., (1993). Risk Management and Construction. Blackwell

Science, London

Husein, Abrar. 2009. Manajemen Proyek. Yogyakarta

Kartam, N A and Kartam, S A (2001) Risk and its management in the Kuwaiti

construction industry: A contractors' perspective. International Journal of

Project Management, 19(6), 325-335.

Lino, Marinus Linggi kala. (2018). “Analisis Risiko Pekerjaan Konstruksi Jaringan

Irigasi Pada Daerah Pedalaman di Kabupaten Tanah Toraja”. Bandung

Nurlela, dan Suprapto Heri, (2014). “Identifikasi dan Analisis Manajemen Risiko Pada

Proyek Pembangunan Infrastruktur Bangunan Gedung Bertingkat”. Depok,

JawaBarat

Risnita. (2012). “Pengembangan Skala Model Likert”

Rosady,Kurniawan. (2015). Analisa Risiko Proyek Pembangunan Fly Over Jalan JuandaAbdul Wahab Syahrani Samarinda.

Sari, E., (2016). Analisis Risiko Proyek pada Pekerjaan Jembatan Sidamukti – Kadu di

Majalengka dengan Metode FMEA dan Decision Tree. Jurnal J-Ensitec, 03(01),

– 46

Soeharto, Iman. 2001. Manajemen Proyek. Jakarta: Erlangga

Sugiyono, (2009)., Metode Penelitian Bisnis, Alfabeta, Bandung


Refbacks

  • There are currently no refbacks.


VOL 1. NOMOR 1. AGUSTUS 2012