ANALISA TINGKAT KERUSAKAN JALAN MENGGUNAKAN METODE PCI (PAVEMENT CONDITION INDEX) DAN APLIKASI SISTEM INFORMASI GEOGRAFIS PADA RUAS JALAN SANGA SANGA - DONDANG

ALFIAN NUR

Abstract


Road damage that occurs in various areas, especially in the Sanga Sanga - Dondang area, Kutai Kartanegara Regency is a very complex problem and the losses suffered are quite large, especially for road users, such as long travel times and traffic accidents. The cause of road damage that occurs in the Sanga Sanga - Dondang road section is the burden of excessive traffic (overloaded) and the slow handling of existing damage so that it becomes more severe. The method used in this survey is a method of visual analysis based on the Pavement Condition Index (PCI) method. The Pavement Condition Index (PCI) method is used to identify damage to the road surface based on the survey results, so that appropriate and efficient handling of repairs can be identified in the study. the Sanga Sanga - Dondang road section and the Geographic Information System (GIS) application function to facilitate the presentation of damage information in the form of maps. The most dense damage to the Sanga Sanga - Dondang Sta 0 + 000 - 18 + 000 road segment, especially in segments 1 to 11, Potholes, Alligator cracking, Weathering, Edge cracking and Patching. The average pavement condition index (PCI) value of the Sanga Sanga - Dondang road section is 33% based on the existing classification, the road segment is classified as poor (Poor) and refers to the PCI matrix for Class I Arterial Roads, the road needs to be done. reconstructed.

Full Text:

pdf

References


Bina Marga 1990, Panduan Survei

dan Perhitungan Waktu

Perjalanan. Lalu Lintas,

Departemen Pekerjaan Umum,

Jakarta. Dirjen Bina Marga.

Bina Marga 1995, Manual

Pemeliharaan Rutin Untuk Jalan

Gambar 18 Html Popup Kerusakan Jalan

Nasional dan Jalan Provinsi Jilid

II, Metode Perbaikan Standar

Badan Penerbit Direktorat

Jenderal Bina Marga,

Departemen Pekerjaan umum,

Jakarta

Bina Marga 1997, Tata Cara

Perencanaan Geometrik Jalan.

Antar Kota Bina Marga

No.038/T/BM/1997. Badan

Penerbit Pekerjaan Umum

Jakarta.

Bina Marga 1999, Pemeliharaan

Rutin Jalan Bina Marga,

Departemen Pekerjaan Umum,

Jakarta

Ir.Sony Sulaksono W.,

M.Sc.2001.SI-374 Rekayasa

Jalan.Bandung:ITB.

Sukirman, S, 1999, Perkerasan

Lentur Jalan Raya, Nova,

Bandung.

Shahin, M. Y. (1994). Pavement

Management for Airports,

Roads, and Parking. Lots.

www.tanahair.indonesia.go.id


Refbacks

  • There are currently no refbacks.


VOL 1. NOMOR 1. AGUSTUS 2012