“PENGARUH CONTRACT CHANGE ORDER PADA KONSULTAN SUPERVISI TERHADAP BIAYA DAN WAKTU”

RUSMA FATIMAH MA'RIFAH

Abstract


In various construction projects often change order or request change. Change order can occur during the construction project and cannot be avoided. The occurrence of change order on construction projects often have a negative impact that can affect project costs and time. This study aims to determine the effect of change order on supervision consultants on cost and time, because not only are executing contractors undergoing change order, supervisory consultants also often experience change order.

This research begins with data retrieval related to the project in the supervision consultant. Furthermore, the data is analyzed and a legal basis study related to contract changes. The result is the effect of change order on the supervision consultant is the loss experienced by the supervision consultant both in terms of losses in terms of costs and losses in terms of time. Based on the analysis of the legal basis, through Presidential Regulation Number 16 of 2018 and Circular Letter of the Director General of Highways Number 02 / SE / Db / 2016 the state regulates the addition of a contract value of a maximum of 10% if a contract change occurs, and the data allocation can be taken from the ceiling the activity concerned.


Keywords


Change Request, Change order, Cost, Time

Full Text:

doc

References


Abrar Husen, 2011. Manajemen Proyek. Yogyakarta : Penerbit Andi

Barrie, Donald S, and Paulson, Boyd C Jr, 1992. Professional Construction Management (3 rded). Third Edition, Singapore : Mc Graw-Hill.

BBPJN V/SMM/PP-REN/03, 2015. Pedoman Pelaksanaan Perubahan Kontrak. Jakarta : Kementerian Pekerjaan Umum dan Perumahan Rakyat

Dimyati, H.A. Hamdan & Nurjaman, Kadar, 2014. Manajemen Proyek. Bandung : Pustaka Setia

Direktorat Penanganan Permasalahan Hukum, 2012. Perpanjangan Waktu dan Pemberian Kesempatan Penyelesaian Pekerjaan. Jakarta : LKPP

Fisk, Edward R, and Reynolds Wayne D, 2006. Construction Project Administration, Eight Edition. New Jersey : Prentice Hall.

Gilberth, Robert D, 1992. Mananging Construction Contract Operational Control for Comersial Risk, Second Edition. John Wiley & Sons. Inc.

Peraturan Presiden No. 16, 2018, Pengadaan Barang/Jasa Pemerintah, Jakarta : Bappenas.

Peraturan Presiden No. 54, 2010, Pengadaan Barang/Jasa Pemerintah, Jakarta : Bappenas.

Peraturan Presiden No. 70, 2012, Pengadaan Barang/Jasa Pemerintah, Jakarta : Bappenas.

Surat Edaran Dirjen Bina Marga No. 02, 2016. Prosedur Standar Pelaksanaan Perubahan (Addendum) Kontrak. Jakarta : Kementerian Pekerjaan Umum dan Perumahan Rakyat

Surat Edaran Dirjen Bina Marga No. 18, 2012. Prosedur Standar Pelaksanaan Perubahan (Addendum) Kontrak. Jakarta : Kementerian Pekerjaan Umum dan Perumahan Rakyat

Willem Sapulette, 2009. Analisa dan Pengaruh Change Order pada Proyek Insfrastruktur dan Bangunan Gedung di Ambon. Jurnal Teknologi. Volume 6 No. 2, Universitas Kristen Indonesia Maluku.


Refbacks

  • There are currently no refbacks.


VOL 1. NOMOR 1. AGUSTUS 2012