STUDI PERBANDINGAN ANTARA SISTEM KONTRAK LUMPSUM DAN KONTRAK UNIT PRICE (HARGA SATUAN)PADA PROYEK PEMBANGUNAN GEDUNG SMP N 6 SAMARINDA

WINDA SEPTI PERMATA SARI

Abstract


The construction projectis a project thathas a lot ofuncertaintiesandrisks. Requiredarisk management approachto identify andcontrol the risksthat might occur. One of themost importantphaseofrisk managementisrisk analysisthat aims to identifysignificantrisksto the project.In this study,the riskanalysis will be doneona comparative studybetweenthe systemcontractsandcontractUnit PricePer diemson projectbuildingSmpN6Samarinda.


Keywords


In comparison,the riskanalysis

Full Text:

doc

Refbacks

  • There are currently no refbacks.


VOL 1. NOMOR 1. AGUSTUS 2012