ANALISIS PRODUKTIVITAS PENGGUNAAN ALAT BERAT PEKERJAAN TIMBUNAN PILIHAN PADA PEMBANGUNAN JALAN

FAIZAH RIFFAT MA'RIFAH

Abstract


Road construction Simp.3 Km.8 Beno Harapan - Kantor Camat Batu Ampar Kutai Timur Regency is a project aimed at facilitating transportation that leads to Batu Ampar subdistrict in Kutai Timur Regency. This research focuses on earthworks in the form of selected pile works. In this work the heavy equipment used are Excavators, Dump Trucks, Motor Graders, Roller Vibrators, and Water Tanks. This research uses quantitative descriptive methods. The analysis carried out is the calculation of cycle time, calculation of productivity of heavy equipment, calculation of the time of use of the tool, calculation of the cost of using the equipment, and scheduling of use of the tool. The results of this study are the excavator productivity is 33,826 m3 / hour, dump truck is 3,972 m3 / hour, motor grader is 0.59 hours, a vibrator roller of 7,995 m3 / hour, and water tank of 49,263 m3 / hour. The total time for using the tool is 13 weeks and the total cost for using the tool is 813,382,282 Rupiah.

Keywords


Productivity, Time, Cost, Heavy Equipment.

Full Text:

pdf

References


Anonim, 2014, “Spesifikasi Alat Berat :

Excavator Dan Shovel”

https://jefrihutagalung.wordpress.com/

/03/21/spesifikasi-alatberat excavator danshovel/ (diakses tanggal 21

Nopember 2014)

Anonim, 2015 “Kimia tanah : filosofi

Tanah Lempung dan Tanah

Merah”

Anonimos, “Panduan Analisis Harga

Satuan”, Direktorat Jenderal

Bina Marga, Departemen

Pekerjaan Umum, Kalimantan

Timur, 2008.

Arthur Wignall, Peter S Kendrik, Roy

Ancill, Malcolm Copson,

Tahun 1992,Proyek Jalan –

Teori & Praktek : Penerbit

Erlangga, Jakarta

Caterpillar Performance Handbook,

Edisi 18 Okcober 1987

Caterpillar Publication., 1997,

Caterpillar Performance

Hand Book, 33th Edition,

Peoria, Illionis, USA.

Departemen Pekerjaan Umum, 2008,

Standar Nasional Indonesia

tentang Analisis Biaya

Pekerjaan Konstruksi,

Penerbit Dep. PU, Jakarta.

Departemen Pekerjaan Umum, Tahun

, Analisa Pekerjaan

Kebinamargaan, Direktorat

Jenderal Bina Marga, , Jakarta

Dipto, 2002, Aplikasi Alat-Alat Berat

Untuk Proyek Pertambangan,

Application Engineering

Departemen PT United

Tractors Indonesia Tbk,

Jakarta.

Djoko Wilopo, Metode Konstruksi dan

Alat – Alat Berat, Badan

Penerbit Universitas

Indonesia (UI-Press), Jakarta,

H.Bactiar Ibrahim, 2001, Rencana dan

of Cost, Penerbit Bumi

Aksara, Jakarta. Hadi, R.,

, Kapasitas Alat-Alat

Berat, Penerbit PU

Tejoyuwono, N., 1983, Buku Pengantar

Pengajian Tanah-Tanah

Wilayah Tropika Dan

Subtropika, Penerbit Gajah

Mada University Prees. P.O.

Box 14, Bulaksumur,

Yogyakarta

Hardiyatmo, H.C., 2007 "Mekanika

Tanah 2", Gadjah Mada

University Press, Yogyakarta,

Hasan A., 2013, Pemindahan Tanah

Mekanis, Tidak Dipublikasi,

Universitas Islam

“45” (UNISMA) Bekasi

http://www.annehira.com/Kimiatanah.htm (diakses tanggal 26

Nopember 2014)

Ir. Rochmanhadi, Alat – Alat Berat dan

Penggunaannya, Yayasan

Badan Penerbit Pekerjaan

Umum, Jakarta, 1992.

Ir. Rochmanhadi, Kapasitas dan

Produksi Alat – Alat Berat,

Ir. Susy Fatena Rostiyanti, M.sc, Alat

Berat untuk Proyek

Konstruksi, Penerbit

Rineka Cipta, Jakarta, 2002.

K Church, Horace, 1981. “Excavation

Handbook”, Mc Graw Hill

Inch. New York,

Komatsu Publication., (1989).,

Komatsu Sales Mates, Japan

Mekanika Tanah : Badan Penerbit

Departemen Pekerjaan Umum,

Jakarta Selatan.

Mukamoko,1994, Dasar Penyusunan

Anggaran Biaya Bangunan,

Penerbit Gaya Media Pratama,

Jakarta.

Pemindahan Tanah Mekanis, Penerbit

Institut Teknologi Nasional

Malang, 1998.

Pengetahuan Dasar Mengenai Alat –

Alat Berat, United Traktor,

Jakatra.

Peraturan Presiden Nomor 54 Tahun

Pasal 66 Ayat (7) dan

Perubahannya dalam

Peraturan Presiden Nomor 70

Tahun 2012

Perturan Menteri Pekerjaan Umum dan

Perumahan Rakyat Nomor

/KPTS/M/2004 Tanggal 17

Desember Tahun 2004.

Direktorat Jenderal Bina

Marga Kementerian

Pekerjaan Umum dan

Perumahan Rakyat, Jakarta

Peurifoy R.L, PE, 1985. “ Constrction

Planning Equipment and

Metods”, 4th Edition, Mc Graw

Hill Book Company,

Peurifoy, et al., 1996

PT United Tractor, Manajemen Alat –

Alat Besar.

Soedrajad, 1982, Efisiensi Penggunaan

Alat Berat Pada Pengaspalan

JalanRaya, Nova, Jakarta.

Wilopo, D., 2011, Metode Konstruksi

dan Alat – Alat Berat,

Fakultas Teknik Universitas

Indonesia, Jakarta.

Rochmanhadi., 1990, Pengantar dan

Dasar – dasar Pemindahan

Tanah Mekanis, Badan

Penerbitan Pekerjaan Umum,

Jakarta.

Sjachdirin, M., Pengoperasian Alat

Berat di Bidang Industri

Konstruksi. Diktat PTM,

Jakarta : Universitas

Tarumanagara, 1997.

Specifications And Aplication

Handbook, Komatsu, Edisi

Januari 1996

Specifications and Aplication

handbook, Edition 5,

Komatsu.

Spesifikasi Umum Untuk Pekerjaan

Jalan dan Jembatan, 2018.

Direktorat Jenderal

Bina Marga Kementerian

Pekerjaan Umum dan

Perumahan Rakyat, Jakarta

Lampiran Peraturan Menteri Pekerjaan

Umum dan Perumahan Rakyat

No 28 Tahun 2016.

Direktorat Jenderal Bina

Marga Kementerian Pekerjaan

Umum dan Perumahan

Rakyat, Jakarta

Sunggono, 1995, Buku Teknik Sipil

:Penerbit Nova, Bandung..

Wesley, Tahun. 1977,


Refbacks

  • There are currently no refbacks.


VOL 1. NOMOR 1. AGUSTUS 2012