ANALISIS PERHITUNGAN HARGA POKOK PROYEK PEMBANGUNAN RUMAH PERUM PERUMNAS BENGKURING SAMARINDA

Basuki Setyono

Abstract


East Kalimantan branch Perumnas doing home construction, one of which is the construction of ten (10) units of houses in SamarindaBengkuring. The purpose of this paper is to calculate the cost of the construction of 10 (ten) Perumnas housing units in East Kalimantan branch locations BengkuringSamarinda use costing.Permasalahan full calculation in this study is whether the cost of housing projects PerumnasBengkuringSamarinda set by Perumnas higher compared to using full costing.Berdasarkan calculation results of the analysis and discussion of the conclusion of the study is the development of the project cost bahwaperhitungan 10 (ten) units Bengkuring location Samarinda conducted Perumnas higher than calculations using the full costing. Findings the research shows that the hypothesis is accepted.

Full Text:

PDF DOC

References


Hansen,Mowen Management Accounting, Edisi Ketujuh, Salemba Empat, Jakarta 2004

Mulyadi, Akuntansi biaya Penentuan Harga Pokok & Pengendalian Biaya Edisi, Edisi Tiga, BPFE Yogyakarta, Yogyakarta 2001.

_______, Akuntansi Biaya,Edisi5, UPP AMP YKPN, Yogyakarta 2005.

Sumarni, Murtini, John Soeprihagnanto, Pengantar Bisnis (Dasar-Dasar Ekonomi Perusahaan), Edisi 5, Liberty Yogyakarta.

Sunarto, Pengantar Akuntansim Biaya, Amrico, Bandung 2002.




DOI: https://doi.org/10.31293/ekm.v1i1.163

Refbacks

  • There are currently no refbacks.