|
Issue |
Title |
|
Vol 11, No 1 (2020) |
ANALISA KINERJA RUAS JALAN PADA JALAN PULAU IRIAN DAN JALAN MULAWARMAN KAWASAN SAMARINDA CENTRAL PLAZA ( SCP ) KOTA SAMARINDA |
Abstract
pdf
|
IMAM FATNUR YASIN |
|
Vol 4, No 1 (2014) |
ANALISA KINERJA RUAS JALAN PADA JALAN RAYA PATTIMURA SAMARINDA |
Abstract
PDF
|
INDAH MAYANGSARI |
|
Vol 11, No 1 (2020) |
ANALISA KINERJA RUAS JALAN UTAMA DI SEKITAR BANDAR UDARA AJI PENGERAN TUMENGGUNG PRANOTO KOTA SAMARINDA (Studi kasus: Jl. SP-3 Sambera, Jl. Poros samarinda muara badak) |
Abstract
pdf
|
MUHAMMAD SUHUDI |
|
Vol 1, No 1 (2017) |
ANALISA KINERJA RUAS JALAN WAHID HASYIM II DI SAMARINDA |
Abstract
pdf
|
HERMANTON M SAID AZIS |
|
Vol 1, No 1 (2018) |
ANALISA KINERJA RUAS PADA JEMBATAN MAHKOTA II KOTA SAMARINDA |
Abstract
Pdf
|
ARIF SETYO BUDIANTO |
|
Vol 14, No 2 (2023) |
ANALISA KINERJA SIMPANG TAK BERSINYAL JALAN GERILYA – JALAN PERJUANGAN KOTA SAMARINDA |
Abstract
pdf
|
FITRIA RAHMAH |
|
Vol 1, No 1 (2018) |
ANALISA KINERJA TERHADAP WAKTU DAN BIAYA DENGAN METODE EARNED VALUE ANALYSIS PADA PEMBANGUNAN GEDUNG AUDITORIUM IAIN SAMARINDA |
Abstract
pdf
|
NOR FAJRI FEBRIANI |
|
Vol 1, No 1 (2018) |
ANALISA KINERJA TRASNPORTASI RODA EMPAT ONLINE WILAYAH KOTA SAMARINDA |
Abstract
pdf
|
ELLY MARLINA |
|
Vol 1, No 1 (2018) |
ANALISA KONTRAK KERJA KONSTRUKSI PADA PROYEK REHAB BENGKEL UNTUK RUANG WIDYAISWARA, PENYULUH DAN LAB. IT. DI DINAS PANGAN, TANAMAN PANGAN DAN HORTIKULTURA KALIMANTAN TIMUR |
Abstract
pdf
|
MUT MAINAH |
|
Vol 11, No 2 (2020) |
ANALISA KONTRAK KERJA KOSTRUKSI PADA PROYEK PEMBANGUNAN GEDUNG GEREJA KATEDRAL SANTA MARIA DI SAMARINDA |
Abstract
pdf
|
RICKY TONY WIJAYA |
|
Vol 13, No 2 (2022) |
ANALISA KONTRAK KERJA UNIT PRICE PADA PROYEK KONSTRUKSI PEMBANGUNAN GEDUNG KEJAKSAAN TINGGI KALIMANTAN TIMUR |
Abstract
pdf
|
Monica Monica |
|
Vol 1, No 1 (2018) |
ANALISA KONTRUKSI PEKERASAN LENTUR DAN PEKERASAN BETON SEMEN PADA PENINGKATAN RUAS JALAN PAHLAWAN KECAMATAN TENGGARONG SEBERANG |
Abstract
doc
|
I NYOMAN DIANTARA PIKA |
|
Vol 1, No 1 (2018) |
ANALISA KOORDINASI SINYAL ANTAR SIMPANG DI KOTA SAMARINDA (Studi Kasus Simpang 4 Basuki Rahmat,Simpang 3 Jalan Kusuma Bangsa,Simpang 3 Jalan Pahlawan) |
Abstract
doc
|
YUDI PRASETIYO |
|
Vol 11, No 1 (2020) |
ANALISA MANAJEMEN BAHAN DENGAN METODE MRP PADA PEMBANGUNAN PROYEK KANTOR KESEHATAN RS. DIRGAHAYU SAMARINDA |
Abstract
doc
|
MUHAMMAD DEFRI |
|
Vol 11, No 1 (2020) |
ANALISA MANAJEMEN BIAYA DENGAN METODE EARNED VALUE ANALISYS PADA PEMBANGUNAN RUMAH SUSUN PONPES HIDAYATULLAH BONTANG |
Abstract
pdf
|
WAHYUNI WAHYUNI |
|
Vol 11, No 2 (2020) |
ANALISA MANAJEMEN LALULINTAS SISTEM 2 ARAH MENJADI 1 ARAH PADA JALAN LAMBUNG MANGKURAT DAN JALAN ACHMAD DAHLAN |
Abstract
pdf
|
GREDA APRISTA LAYSIA VIKKI |
|
Vol 11, No 1 (2020) |
ANALISA MANAJEMEN LALULINTAS SISTEM 2 ARAH MENJADI 1 ARAH PADA JALAN LAMBUNG MANGKURAT DAN JALAN ACHMAD DAHLAN |
Abstract
pdf
|
GREDA APRISTA CAYSIA VIKKI |
|
Vol 1, No 1 (2018) |
ANALISA MANAJEMEN RISIKO PADA PROYEK REHAB BENGKEL UNTUK RUANG WIDYAISWARA, PENYULUH, DAN LAB. IT DI DINAS PANGAN, TANAMAN PANGAN DAN HORTIKULTURA PROVINSI KALIMANTAN TIMUR |
Abstract
pdf
|
TRACY ALEXCIA LITAD |
|
Vol 1, No 1 (2018) |
ANALISA MANAJEMEN RISIKO PADA PROYEK REHAB BENGKEL UNTUK RUANG WIDYAISWARA, PENYULUH, DAN LAB. IT DI DINAS PANGAN, TANAMAN PANGAN DAN HORTIKULTURA PROVINSI KALIMANTAN TIMUR |
Abstract
pdf
|
TRACY ALEXIA LITAD |
|
Vol 11, No 2 (2020) |
ANALISA MANAJEMEN WAKTU DENGAN METODE CPM DAN PERT PADA PROYEK PEMBANGUNAN KEMBALI SDN 012 KELURAHAN RAPAK DALAM KECAMATAN SAMARINDA SEBERANG |
Abstract
pdf
|
ASWAR AZIS |
|
Vol 13, No 1 (2022) |
ANALISA MANAJEMEN WAKTU METODE PERT DAN CPM DALAM PELAKSANAAN PROYEK REHABILITASI RUANG KELAS SMP NEGERI 12 SAMARINDA |
Abstract
pdf
|
Bagus Robbiyantoro |
|
Vol 1, No 2 (2013) |
ANALISA MANAJEMEN WAKTU PADA KEGIATAN PEMBANGUNAN JALAN H.RIFADIN - JEMBATAN MAHULU DI PROVINSI KALIMANTAN TIMUR |
Abstract
doc
|
IS KANDAR |
|
Vol 13, No 3 (2022) |
ANALISA MENEJEMEN PELAKSANAAN PADA PROYEK PEMBANGUNAN MASJID PONDOK TAHFIDS AL FAJAR JALAN ABDUL AWAHAB SYAHRANI KELURAHAN AIR HITAM SAMARINDA ULU |
Abstract
pdf
|
Hendrikus Kia Boli |
|
Vol 1, No 1 (2017) |
ANALISA MODEL MATEMATIS AKIBAT PENGARUH VARIASI FAKTOR REDUKSI BEBAN HIDUP PADA SISTEM RANGKA PEMIKUL MOMEN KHUSUS |
Abstract
pdf
|
MUHAMMAD NUR KHUSYENI |
|
Vol 1, No 2 (2013) |
ANALISA MUTU BETON PADA ABUTMENT JEMBATAN DI JALAN LINGKAR PULAU NUNUKAN |
Abstract
doc
|
YUYUN YUANA |
|
101 - 125 of 1243 Items |
<< < 1 2 3 4 5 6 7 8 9 10 > >> |