|
Issue |
Title |
|
Vol 11, No 2 (2020) |
ANALISA PERBANDINGAN PERKERASAN JALAN DENGAN METODE ANALISIS KOMPONEN SKBI 1987 DAN METODE MANUAL DESAIN PERKERASAN JALAN 2017 (Studi Kasus : Pada Jalan Simpang TBA – Pusat Perkantoran Kabupaten Mahakam Ulu) |
Abstract
pdf
|
BAHARUDDIN KADIR |
|
Vol 2, No 2 (2016) |
ANALISA PERBANDINGAN PONDASI KONSTRUKSI SARANG LABA-LABA DENGAN PONDASI TELAPAK PADA PROYEK PEMBANGUNAN STORAGE TANK KAPASITAS 900.000 LITER |
Abstract
pdf
|
DERMAWAN WIBISONO |
|
Vol 1, No 1 (2017) |
ANALISA PERBANDINGAN PONDASI TIANG PANCANG BETON BERTULANG DENGAN PIPA BAJA SECHEDULE PADA PEMBANGUNAN GEDUNG KANTOR TERMINAL OIL PT. MIGAS MANDIRI PRATAMA KALIMANTAN TIMUR |
Abstract
pdf
|
SAN IAH |
|
Vol 1, No 1 (2018) |
ANALISA PERBANDINGAN PONDASI TIANG PANCANG PADA PEMBANGUNAN KANTOR PELAYANAN PERBENDAHARAAN NEGARA (KPPN) SAMARINDA |
Abstract
pdf
|
DAVIT ASMARENDRA |
|
Vol 11, No 2 (2020) |
ANALISA PERBANDINGAN TEBAL PERKERASAN KAKU (RIGID PAVEMENT) DENGAN METODE BINA MARGA 2017 DAN METODE AASHTO 1993 PADA RUAS JALAN NEGARA KABUPATEN PANAJAM PASER UTARA |
Abstract
doc
|
SAIFUL MARDI YUSUF |
|
Vol 1, No 1 (2018) |
ANALISA PERBANDINGAN TEBAL PERKERASAN LENTUR DENGAN MENGGUNAKAN METODE BINA MARGA DAN MANUAL DESAIN PERKERASAN PADA RUAS JALAN MALINAU – MENSALONG |
Abstract
doc
|
DEM YADI |
|
Vol 12, No 1 (2021) |
ANALISA PERBANDINGAN TEBAL PERKERASAN LENTUR DENGAN METODE ANALISIS KOMPONEN SKBI 1987 DAN METODE MANUAL DESAIN PERKERASAN JALAN 2017 (Studi Khasus : Jalan Lingkar Stadion Palaran) |
Abstract
pdf
|
RAMA WIJAYA |
|
Vol 13, No 3 (2022) |
ANALISA PERBANDINGAN WAKTU MENGGUNAKAN METODE NETWORK PLANNING PADA PEMBANGUNAN REHABILITASI TOTAL PUSKESMAS LOA DURI KEC. LOA JANAN |
Abstract
pdf
|
IQBAL KRISNANTO |
|
Vol 11, No 1 (2020) |
ANALISA PERCEPATAN DURASI DENGAN METODE “TIME COST TRADE OFF” PADA PROYEK PENINGKATAN JALAN BUKIT SERIBU (LAPEN-RIGID) KOTA SAMARINDA |
Abstract
pdf
|
ACHMAD DARMADI |
|
Vol 12, No 1 (2021) |
ANALISA PERCEPATAN PROYEK MENGGUNAKAN METODE TCTO (TIME COST TRADE OFF) (Studi Kasus : Proyek Pembangunan Rumah Susun Ponpes Hidayatullah Bontang) |
Abstract
pdf
|
ACHMAD RAMADHANI |
|
Vol 14, No 2 (2023) |
Analisa Percepatan Waktu Menggunakan Metode Cpm Dan Pert Pada Pembangunan Jembatan Gantung Sungai Gelinggang Kabupaten Kutai Timur |
Abstract
pdf
|
CAROLINE PUTRI LEVUNG |
|
Vol 4, No 2 (2014) |
ANALISA PERENCANAAN DINDING PENAHAAN TANAH JL. BONTANG – SANGATTA STA 34+300 KIRI PROVINSI KALIMANTAN TIMUR |
Abstract
doc
|
Rachmat Hidayat |
|
Vol 4, No 1 (2014) |
ANALISA PERENCANAAN DINDING PENAHAN TANAH JL. AM. SALEHIDDIN KEC. TENGGARONG KAB. KUTAIKARTANEGARA PROVINSI KALIMANTAN TIMUR |
Abstract
doc
|
Muhammad Rizal Ariyanto |
|
Vol 1, No 1 (2017) |
ANALISA PERENCANAAN DINDING PENAHAN TANAH TIPE KNTILEVER PADA JALAN POROS SAMBOJA-SEPAKU KALIMANTAN TIMUR |
Abstract
doc
doc
|
ACHMAD TRI ALFIANTO |
|
Vol 4, No 1 (2014) |
ANALISA PERENCANAAN JALAN PADA PENINGKATAN RUAS JALAN LOA TEBU - SEBULU STA 0+000 s/d STA 10+000 KABUPATEN KUTAI KARTANEGARA |
Abstract
doc
|
MUHAMMAD RIZKY ANUGRAH BAINI |
|
Vol 1, No 1 (2018) |
ANALISA PERENCANAAN PERPAANJANGAN BANDAR UDARA LONG APUNG |
Abstract
pdf
|
TOMY PRIYANTO |
|
Vol 1, No 1 (2017) |
ANALISA PERENCANAAN RIGID PAVEMENT PADA RUAS JALAN RING ROAD II KOTA SANGATTA |
Abstract
doc
|
WAHYU ISNANDAR |
|
Vol 4, No 1 (2014) |
ANALISA PERENCANAAN TEBAL PERKERASAN JALAN SEBULU MODEREN MENUJU JALAN PROPINSI DENGAN METODE ANALISA KOMPONEN |
Abstract
doc
|
Jat miko |
|
Vol 4, No 1 (2014) |
ANALISA PERHITUNGAN BIAYA PEMESANAN MATERIAL PADA PROYEK PEMBANGUNAN JALAN PERBATASAN DI JALAN SEKATAK BUJI-MALINAU, MALINAU-LONG ALANGO, DAN MALINAU LONG BAWAN I |
Abstract
doc
|
ASROFIL ANAS |
|
Vol 1, No 1 (2012) |
ANALISA PERHITUNGAN BIAYA TUNDAAN LALU LINTAS PADA SIMPANG TIGA JALAN JUANDA DAN JUANDA 8 KOTA SAMARINDA |
Abstract
doc
|
Dwi Dedy Mandala R |
|
Vol 4, No 1 (2014) |
ANALISA PERHITUNGAN DAN RESIKO MANAGEMENT STRUKTUR ATAS JEMBATAN RANGKA BENTANG 40 METER PADA JEMBATAN BUNGKUK PALARAN |
Abstract
PDF
|
YUNITA ELVIRA WIRANATA |
|
Vol 1, No 2 (2013) |
ANALISA PERHITUNGAN DAYA DUKUNG PONDASI TIANG PANCANG PADA PROYEK PEMBANGUNAN GEDUNG OLAH RAGA (GOR) GULAT SAMARINDA |
Abstract
doc
|
HUTAMI DWI RAMADHANI |
|
Vol 4, No 2 (2014) |
ANALISA PERHITUNGAN DINDING PENAHAN TANAH PADA STA 5+550 JALAN POROS LOA TEBU – SEBULU MODERN KEC.TENGGARONG |
Abstract
doc
|
AHIR UDIN |
|
Vol 2, No 1 (2013) |
ANALISA PERHITUNGAN HUBUNGAN KECEPATAN, VOLUME, DAN KEPADATAN ARUS KENDARAAN PADA RUAS JALAN MUHAMAD YAMIN KOTA SAMARINDA |
Abstract
doc
|
GALIH PRASETYA UTAMA |
|
Vol 1, No 2 (2013) |
ANALISA PERHITUNGAN PENGGUNAAN ALAT PADA PELAKSANAAN PENGASPALAN RUAS JALAN SIMPANG PERDAU – MUARA LEMBAK |
Abstract
doc
|
WAHYU JULIARTO |
|
176 - 200 of 1243 Items |
<< < 3 4 5 6 7 8 9 10 11 12 > >> |