|
Issue |
Title |
|
Vol 11, No 1 (2020) |
ANALISA PENGENDALIAN PERSEDIAAN MATERIAL DENGAN METODE EOQ PADA PROYEK KONTRUKSI PEMBANGUNAN KEMBALI SDN 012 SAMARINDA KALIMANTAN TIMUR |
Abstract
PDF
|
ELYEZER FRANCLIN |
|
Vol 11, No 1 (2020) |
ANALISA PENGENDALIAN PERSEDIAAN MATERIAL DENGAN METODE EOQ PADA PROYEK KONTRUKSI PEMBANGUNAN KEMBALI SDN 012 SAMARINDA KALIMANTAN TIMUR |
Abstract
doc
|
ELYEZER FRANCLIN |
|
Vol 13, No 1 (2022) |
ANALISA PENGENDALIAN WAKTU PEKERJAAN PADA PROYEK LANJUTAN PEMBANGUNAN GEDUNG LEMBAGA BUDAYA ADAT KUTAI KOTA SAMARINDA |
Abstract
pdf
pdf
|
Febriyanto Febriyanto |
|
Vol 4, No 2 (2014) |
ANALISA PENGGUNAAN ALAT BERAT DI TINJAU TERHADAP WAKTU PELAKSANAAN PEMBANGUNAN JALAN KE PELABUHAN KENYAMUKAN DI KABUPATEN KUTAI TIMUR |
Abstract
doc
|
ACHMAD RIZQI FADHILAH |
|
Vol 4, No 1 (2014) |
ANALISA PENGGUNAAN PASIR EX. SIMPANG PASIR PALARAN TERHADAP KUAT TEKAN BETON K 250 |
Abstract
PDF
|
ARIEF RAHMAN |
|
Vol 1, No 1 (2016) |
ANALISA PENGGUNAAN PASIR PUTIH Ex. PALARAN SEBAGAI BAHAN TAMBAHAN PADA CAMPURAN TANAH PILIHAN DIGUNAKAN PADA JALAN PANGERAN SURYANATA STA 07 + 700 |
Abstract
doc
|
ASFIANUR YADI |
|
Vol 13, No 3 (2022) |
ANALISA PENGUKURAN TOPOGRAFI TOTAL STATION DTM-322 DAN PESAWAT NIR AWAK DJI PHANTOM 3 PRO PADA PEMBUATAN KONTUR PERUMAHAN PINANG HILL’S DI KOTA SAMARINDA |
Abstract
pdf
pdf
|
M ALAUDIN ATHARI |
|
Vol 1, No 1 (2019) |
ANALISA PENILAIAN RESIKO KESELAMATAN DAN KESEHATAN KERJA PADA PROYEK PEMBANGUNAN RSUD ULIN DI BANJARMASIN |
Abstract
doc
|
ADAM AMSHARI |
|
Vol 14, No 1 (2023) |
ANALISA PENILAIAN RESIKO KESELAMATAN DAN KESEHATAN KERJA PADA PROYEK PEMBANGUNAN RSUD ULIN DI BANJARMASIN |
Abstract
pdf
|
ADAM AMSHARI |
|
Vol 2, No 2 (2016) |
ANALISA PENJADWALAN WAKTU PADA PEMBANGUNAN JEMBATAN GUNUNG LINGAI LEMPAKE TEPIAN |
Abstract
doc
|
MUHAMMAD SAIFUL ARIFIN |
|
Vol 1, No 1 (2018) |
ANALISA PENJADWALAN WAKTU PEMBANGUNAN LANJUTAN SMPN 38 LOK BAHU KOTA SAMARINDA |
Abstract
pdf
|
KELVIN CHANG |
|
Vol 1, No 2 (2013) |
Analisa Penurunan Konsolidasi Pada Tanah Lempung Akibat Berat Timbunan Pada Proyek Lanjutan Iriasi Kota Bangun |
Abstract
doc
|
DWI ERNA YUNITA |
|
Vol 1, No 1 (2016) |
ANALISA PERBANDINGAN AGREGAT KELAS C MURNI DENGAN CAMPURAN PEMAKAIAN ABU BATU PADAS |
Abstract
doc
|
IWAN SUBIYANTORO |
|
Vol 1, No 1 (2012) |
ANALISA PERBANDINGAN BIAYA DAN WAKTU PADA KENDARAAN PRIBADI DAN KENDARAAN UMUM STUDI KASUS : PERUMAHAN PELITA V |
Abstract
doc
|
EDWIN SILVESTER RIA |
|
Vol 1, No 1 (2012) |
ANALISA PERBANDINGAN BIAYA DAN WAKTU PADA KENDARAAN PRIBADI DAN KENDARAAN UMUM STUDI KASUS : PERUMAHAN PELITA V |
Abstract
doc
|
EDWIN SILVESTER RIA |
|
Vol 1, No 1 (2018) |
ANALISA PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN BETON CAST IN SITU DENGAN PRE CAST STUDI KASUS : PENGENDALIAN BANJIR SISTEM LOA JANAN DAN RAPAK DALAM SAMARINDA |
Abstract
pdf
|
JOKO SULISTIO |
|
Vol 11, No 1 (2020) |
ANALISA PERBANDINGAN BIAYA OPERASIONAL KENDARAAN (BOK) DALAM PEMILIHAN RUTE PERJALANAN (Lokasi Studi : Terminal Lempake - Terminal Sungai Kunjang |
Abstract
pdf
|
MUHAMMAD HARDI YANTO |
|
Vol 1, No 1 (2016) |
ANALISA PERBANDINGAN CAMPURAN BETON DENGAN AGREGAT HALUS EX. MAHAKAM EX. PALU DAN AGREGAT KASAR EX. PALUDENGAN CARA PERENDAMAN AIR RAWA DAN AIR PDAM |
Abstract
doc
|
SUPOMO TRI WIDODO |
|
Vol 1, No 1 (2016) |
ANALISA PERBANDINGAN CAMPURAN BETON DENGAN MENGGUNAKAN AGREGAT HALUS EX. TENGGARONG EX. PALU DAN AGREGAT KASAR EX. PALU DENGAN CARA PERENDAMAN DAN TIDAK DI RENDAM |
Abstract
doc
|
HAIDIR RIZKINA |
|
Vol 1, No 1 (2017) |
ANALISA PERBANDINGAN DINDING PENAHAN TANAH TYPE COUNTERFORT DAN CANTILEVER JALAN SIMPANG TIGA TANJUNG PALAS SEKATAK BUJI STA. 107+ STA.172 KABUPATEN MALINAU PROVINSI KALIMANTAN UTARA |
Abstract
pdf
PDF
|
ANTONIUS ALFONSIUS NGGALA |
|
Vol 4, No 2 (2014) |
ANALISA PERBANDINGAN HASIL PENGUKURAN KOORDINAT DAN ELEVASI DENGAN ALAT TOTAL STATION DAN GPS GEODETIC DI FOLDER SANGATTA KAB. KUTAI TIMUR |
Abstract
pdf
|
DENNY SUHENI |
|
Vol 1, No 2 (2013) |
ANALISA PERBANDINGAN KUAT TEKAN BETON DARI CAMPURAN BETON TAMBAH GULA DAN BATUBARA |
Abstract
doc
|
RIDWAN NOR DIANSYAH |
|
Vol 12, No 3 (2021) |
ANALISA PERBANDINGAN KUAT TEKAN BETON NORMAL DAN BETON MENGGUNAKAN SEMEN 450 KG DENGAN BAHAN TAMBAHAN ZAT ADDITIVES EX. SIKA PADA PROYEK JEMBATAN 100 M DI DESA LONG LEES,KABUPATEN KUTAI TIMUR |
Abstract
|
ORTEGA UTA SANDY |
|
Vol 13, No 3 (2022) |
ANALISA PERBANDINGAN PENGGUNAAN AGREGAT BATU BESAUNG DENGAN PASIR MAHAKAM DAN BATU PALU DENGAN PASIR MAHAKAM TERHADAP KARAKTERISTIK CAMPURAN AC-BC (ASPHALT CONCRETE BINDER COURSE) |
Abstract
pdf
|
ARIF RAHMADI |
|
Vol 1, No 1 (2016) |
ANALISA PERBANDINGAN PERHITUNGAN MENGGUNAKAN METODE GENESIS DALAM PENANGANAN ABRASI PANTAI TANJUNG HARAPAN KAB. KUTAI KARTANEGARA |
Abstract
pdf
|
FA ZRI |
|
151 - 175 of 1243 Items |
<< < 2 3 4 5 6 7 8 9 10 11 > >> |