|
Issue |
Title |
|
Vol 12, No 1 (2021) |
ANALISA PEMENUHAN KEBUTUHAN AIR BERSIH DI KELURAHAN SINDANG SARI KECAMATAN SAMBUTAN KOTA SAMARINDA |
Abstract
pdf
|
MOHAMMAD SYAIRI |
|
Vol 1, No 1 (2016) |
ANALISA PEMILIHAN MODA TRANSPORTASI UNTUK PERJALANAN SAMARINDA-BONTANG MENGGUNAKAN MODEL LOGIT-BINER-SELISIH |
Abstract
doc
|
NOVA RIYANI |
|
Vol 4, No 1 (2014) |
ANALISA PEMODELAN BANGKITAN PERGERAKAN LALU LINTAS PADA SEKOLAH MENENGAH UMUM NEGERI SAMARINDA |
Abstract
Untitled
doc
|
EKA PURNAMA |
|
Vol 1, No 1 (2015) |
ANALISA PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) PADA PEMBANGUNAN JEMBATAN KUTAI KARTANEGARA |
Abstract
doc
|
BASUKI UNDITA |
|
Vol 1, No 1 (2018) |
ANALISA PENGARUH BEBAN MUATAN KENDARAAN BERLEBIH TERHADAP UMUR PERKERASAN JALAN GUSIG – SP3 BLUSUH |
Abstract
pdf
|
MUHAMMAD KHOIRONI |
|
Vol 11, No 1 (2020) |
ANALISA PENGARUH KESELAMATAN DAN KESEHATAN KERJA (K3) TERHADAP KINERJA PEKERJA KONSTRUKSI PROYEK LANJUTAN PEMBANGUNAN EKS GEDUNG KANTOR KOPERASI KOTA SAMARINDA |
Abstract
pdf
|
NUR ANNISA KIRANA |
|
Vol 4, No 1 (2014) |
ANALISA PENGARUH PARKIR PADA BADAN JALAN TERHADAP KECEPATAN RUAS JALAN PAHLAWAN DI KOTA SAMARINDA |
Abstract
doc
|
Desy Rara Amiyati |
|
Vol 11, No 1 (2020) |
ANALISA PENGARUH RISIKO PADA KONTRAK KERJA TERHADAP BIAYA PADA PEMBANGUNAN GEDUNG AULA LEMBAGA PENJAMINAN MUTU PENDIDIKAN (LPMP) KALIMANTAN TIMUR |
Abstract
pdf
|
NUR FADLI |
|
Vol 1, No 1 (2018) |
ANALISA PENGARUH VOLUME LALU LINTAS TERHADAP TINGKAT KEBISINGAN PADA DAERAH PERKANTORAN DI JALAN BASUKI RAHMAT SAMARINDA |
Abstract
doc
|
AGUS FITRIANTO |
|
Vol 12, No 2 (2021) |
ANALISA PENGENDALIAN BIAYA DAN WAKTU DENGAN KONSEP NILAI HASIL (EARNED VALUE) PROYEK PEMBANGUNA GEDUNG KANTOR KELURAHAN DADIMULYA SAMARINDA |
Abstract
pdf
|
MOH HENDRO SANTOSO |
|
Vol 12, No 2 (2021) |
ANALISA PENGENDALIAN MANAJEMEN WAKTU PROYEK PEMBANGUNAN GEDUNG SD ISLAMIC CENTER DENGAN METODE NETWORK PLANNING |
Abstract
pdf
|
DEVI TRI ASTUTI |
|
Vol 1, No 1 (2018) |
ANALISA PENGENDALIAN MUTU HASIL UJI BETON UNTUK KEPALA JEMBATAN (ABUTMENT) PADA PEMBANGUNAN JEMBATAN RUAS JALAN TALISAYAN DI KABUPATEN BERAU |
Abstract
Doc
|
BENGET P SITUMORANG |
|
Vol 11, No 1 (2020) |
ANALISA PENGENDALIAN PERSEDIAAN MATERIAL DENGAN METODE EOQ PADA PROYEK KONTRUKSI PEMBANGUNAN KEMBALI SDN 012 SAMARINDA KALIMANTAN TIMUR |
Abstract
PDF
|
ELYEZER FRANCLIN |
|
Vol 11, No 1 (2020) |
ANALISA PENGENDALIAN PERSEDIAAN MATERIAL DENGAN METODE EOQ PADA PROYEK KONTRUKSI PEMBANGUNAN KEMBALI SDN 012 SAMARINDA KALIMANTAN TIMUR |
Abstract
doc
|
ELYEZER FRANCLIN |
|
Vol 4, No 2 (2014) |
ANALISA PENGGUNAAN ALAT BERAT DI TINJAU TERHADAP WAKTU PELAKSANAAN PEMBANGUNAN JALAN KE PELABUHAN KENYAMUKAN DI KABUPATEN KUTAI TIMUR |
Abstract
doc
|
ACHMAD RIZQI FADHILAH |
|
Vol 4, No 1 (2014) |
ANALISA PENGGUNAAN PASIR EX. SIMPANG PASIR PALARAN TERHADAP KUAT TEKAN BETON K 250 |
Abstract
PDF
|
ARIEF RAHMAN |
|
Vol 1, No 1 (2016) |
ANALISA PENGGUNAAN PASIR PUTIH Ex. PALARAN SEBAGAI BAHAN TAMBAHAN PADA CAMPURAN TANAH PILIHAN DIGUNAKAN PADA JALAN PANGERAN SURYANATA STA 07 + 700 |
Abstract
doc
|
ASFIANUR YADI |
|
Vol 1, No 1 (2019) |
ANALISA PENILAIAN RESIKO KESELAMATAN DAN KESEHATAN KERJA PADA PROYEK PEMBANGUNAN RSUD ULIN DI BANJARMASIN |
Abstract
doc
|
ADAM AMSHARI |
|
Vol 2, No 2 (2016) |
ANALISA PENJADWALAN WAKTU PADA PEMBANGUNAN JEMBATAN GUNUNG LINGAI LEMPAKE TEPIAN |
Abstract
doc
|
MUHAMMAD SAIFUL ARIFIN |
|
Vol 1, No 1 (2018) |
ANALISA PENJADWALAN WAKTU PEMBANGUNAN LANJUTAN SMPN 38 LOK BAHU KOTA SAMARINDA |
Abstract
pdf
|
KELVIN CHANG |
|
Vol 1, No 2 (2013) |
Analisa Penurunan Konsolidasi Pada Tanah Lempung Akibat Berat Timbunan Pada Proyek Lanjutan Iriasi Kota Bangun |
Abstract
doc
|
DWI ERNA YUNITA |
|
Vol 1, No 1 (2016) |
ANALISA PERBANDINGAN AGREGAT KELAS C MURNI DENGAN CAMPURAN PEMAKAIAN ABU BATU PADAS |
Abstract
doc
|
IWAN SUBIYANTORO |
|
Vol 1, No 1 (2012) |
ANALISA PERBANDINGAN BIAYA DAN WAKTU PADA KENDARAAN PRIBADI DAN KENDARAAN UMUM STUDI KASUS : PERUMAHAN PELITA V |
Abstract
doc
|
EDWIN SILVESTER RIA |
|
Vol 1, No 1 (2012) |
ANALISA PERBANDINGAN BIAYA DAN WAKTU PADA KENDARAAN PRIBADI DAN KENDARAAN UMUM STUDI KASUS : PERUMAHAN PELITA V |
Abstract
doc
|
EDWIN SILVESTER RIA |
|
Vol 1, No 1 (2018) |
ANALISA PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN BETON CAST IN SITU DENGAN PRE CAST STUDI KASUS : PENGENDALIAN BANJIR SISTEM LOA JANAN DAN RAPAK DALAM SAMARINDA |
Abstract
pdf
|
JOKO SULISTIO |
|
126 - 150 of 1177 Items |
<< < 1 2 3 4 5 6 7 8 9 10 > >> |