| Issue | Title | |
| Vol 4, No 1 (2014) | PERBANDINGAN SISTEM KONTRAK BERBASIS KINERJA ATAU PERFORMANCE BASED CONTRACT (PBC) DAN KONTRAK TRADISIONAL | Abstract doc |
| BAYU WIBOWO | ||
| Vol 4, No 2 (2014) | PERBANDINGAN SISTEM KONTRAK BERBASIS KINERJA ATAU PERFORMANCE BASED CONTRACT (PBC) DAN KONTRAK TRADISIONAL” | Abstract doc |
| BAYU WIBOWO | ||
| Vol 1, No 1 (2016) | PERBANDINGAN TIANG PANCANG BAJA DAN BETON PADA PERENCANAAN DINDING PENAHAN TANAH CANTILEVER DI KM-09 JALAN POROS SAMARINDA – TENGGARONG DI TINJAU DARI SEGI BIAYA DAN KEAMANAN | Abstract doc |
| FEBRIANSYAH NURDIN | ||
| Vol 2, No 2 (2016) | PERENCANAAN AGRO TECHNOPARK MINI DI KAWASAN SPP NEGERI SAMARINDA | Abstract doc |
| TARY TRI FARAMITA | ||
| Vol 14, No 2 (2023) | PERENCANAAN AGROWISATA BUAH DI KOTA SAMARINDA DENGAN PENERAPAN ARSITEKTUR ANALOGI | Abstract pdf |
| IMAM ANDIRA DHARMAWAN | ||
| Vol 1, No 1 (2019) | PERENCANAAN AGROWISATA BUAH DI KOTA SAMARINDA DENGAN PENERAPAN ARSITEKTUR ANALOGI | Abstract pdf |
| IMAM ANDIRA DHARMAWAN | ||
| Vol 1, No 1 (2018) | PERENCANAAN AKADEMI KEPERAWATAN DI SAMARINDA DENGAN PENERAPAN LAMIN DAYAK DESA PAMPANG | Abstract pdf |
| MUHAMMAD SYAFRUDIN | ||
| Vol 1, No 1 (2017) | PERENCANAAN APARTEMEN DENGAN PENERAPAN RECREATION FAMILY FACILITIES DI KOTA SAMARINDA | Abstract pdf |
| RIZKY APRILYA ARISANDY | ||
| Vol 2, No 2 (2016) | PERENCANAAN ASRAMA HAJI TRANSIT KABUPATEN KUTAI TIMUR DI KOTA SANGATTA | Abstract doc |
| DENI ANDRA KUSUMA | ||
| Vol 12, No 1 (2021) | PERENCANAAN BABY AND KIDS CARE CENTER DI SAMARINDA DENGAN PENDEKATAN ARSITEKTUR KONTEMPORER | Abstract pdf |
| DIAN CAHYA FATIKHASARI | ||
| Vol 4, No 2 (2014) | Perencanaan Badminton Training Center Di Kabupaten Berau | Abstract doc |
| WAHYU SAPUTRA | ||
| Vol 1, No 1 (2018) | PERENCANAAN BALAI PELATIHAN PETERNAKAN SAPI POTONG DENGAN PENDEKATAN ARSITEKTUR METAFORA | Abstract doc |
| FAHRIANSYAH ANSHARI | ||
| Vol 1, No 2 (2013) | Perencanaan Beton Bertulang Bangunan Rumah Toko (Ruko) Di Jalan Selamet Riyadi Samarinda | Abstract doc |
| Anugrah Ramadhani | ||
| Vol 4, No 2 (2014) | PERENCANAAN BETON BERTULANG PADA GEDUNG PERPUSTAKAAN KAMPUS STAIS SANGATTA | Abstract doc |
| NIKO DIMUS | ||
| Vol 1, No 1 (2016) | PERENCANAAN CAMPURAN ASPAL BETON AC-BC DENGAN FILLER ABU SEKAM PADI, PASIR ANGGANA, DAN SPLIT PALU | Abstract doc |
| AHMAD BASUKI | ||
| Vol 1, No 1 (2017) | Perencanaan Campuran Beton Normal F’c 40 MPa Dengan Material Lokal ( Agregat Kasar Ex. Selabing dan Ex Muara Wahau ) | Abstract doc |
| SETIAJI CHANDRA PERDANA | ||
| Vol 1, No 1 (2018) | PERENCANAAN CONTEMPORARY BUSINESS HOTEL SAMARINDA | Abstract doc doc |
| IRAWAN SEPTYAWAN PRATAMA | ||
| Vol 4, No 1 (2014) | PERENCANAAN DAN BINA PROGRAM PENGAMANAN PADA KAWASAN PANTAI BATU LEMAMPU PULAU SEBATIK | Abstract doc |
| AMBO EDI | ||
| Vol 1, No 1 (2017) | PERENCANAAN DAN DESAIN SALURAN DRAINASE KAWASAN PERUMAHAN MULAWARMAN RESIDENCE KOTA SAMARINDA PADA SEGMEN II | Abstract Untitled pdf |
| RISNA WATI | ||
| Vol 2, No 2 (2016) | PERENCANAAN DAN PERANCANGAN HOTEL BINTANG 5 PENEKANAN PADA ARSITEKTUR HIJAU | Abstract PDF |
| Aidil Fitriansyah | ||
| Vol 1, No 2 (2013) | PERENCANAAN DAN PERANCANGAN KAWASAN WISATA EKS LAHAN TAMBANG | Abstract doc |
| DWI SETIAWAN | ||
| Vol 1, No 2 (2013) | PERENCANAAN DINDING PENAHAN TANAH PADA RUAS JALAN BALIKPAPAN - SAMARINDA KM. 54 PROVINSI KALIMANTAN TIMUR | Abstract doc |
| RONI WONGKAR | ||
| Vol 1, No 1 (2019) | PERENCANAAN DINDING PENAHAN TANAH DENGAN TYPE GRAVITASI PADA PEMBANGUNAN GEDUNG S.P.N DI KUTAI KARTANEGARA | Abstract doc |
| CATUR PRASETYA | ||
| Vol 2, No 2 (2016) | PERENCANAAN DINDING PENAHAN TANAH PADA LAPANGAN OLAH RAGA UPTD BALAI PELATIHAN KESEHATAN (BAPELKES) SAMARINDA | Abstract doc |
| HAS FIANSYAH | ||
| Vol 4, No 1 (2014) | PERENCANAAN DINDING PENAHAN TANAH PADA RUAS JALAN TENGGARONG SEBERANG KM 10 KECAMATAN TENGGARONG SEBERANG | Abstract doc |
| JUM RI | ||
| 751 - 775 of 1238 Items | << < 26 27 28 29 30 31 32 33 34 35 > >> | |