|
Issue |
Title |
|
Vol 14, No 2 (2023) |
PERANCANGAN MONUMEN PERJUANGAN SEBAGAI IDENTITAS KOTA SANGA-SANGA |
Abstract
pdf
pdf
|
ELIDA SEFRINA |
|
Vol 1, No 1 (2019) |
PERANCANGAN MONUMEN PERJUANGAN SEBAGAI IDENTITAS KOTA SANGA-SANGA |
Abstract
pdf
Untitled
|
ELIDA SEFRINA |
|
Vol 1, No 1 (2019) |
PERANCANGAN RESORT BUKIT BATU PUTIH DI KOTA SAMARINDA DENGAN PENEKANAN ARSITEKTUR TROPIS |
Abstract
pdf
|
SEPTIANI DWI CHAHYANTI |
|
Vol 1, No 1 (2018) |
PERANCANGAN RUANG SERBAGUNA DI TENGGARONG, KUTAI KARTANEGARA |
Abstract
Doc
|
ADAM KHADAFI |
|
Vol 1, No 1 (2018) |
PERANCANGAN STRUKTUR DINDING PENAHAN TANAH PADA PEKERJAAN PENANGANAN LONGSORAN JALAN BATU CERMIN KOTA SAMARINDA |
Abstract
pdf
|
JUMA IDI |
|
Vol 1, No 1 (2018) |
PERANCANGAN STRUKTUR DINDING PENAHAN TANAH PADA RUAS JALAN BTS. KOTA TENGGARONG – SP.3 SENONI KABUPATEN KUTAI KARTANEGARA PROVINSI KALIMANTAN TIMUR |
Abstract
pdf
|
RUDI YANTO |
|
Vol 1, No 2 (2013) |
PERANCANGAN TAMAN REKREASI KELUARGA DIKAWASAN TEPIAN SUNGAI MAHAKAM KOTA SAMARINDA |
Abstract
doc
|
PAR YONO |
|
Vol 1, No 2 (2013) |
PERANCANGAN TAMAN REKREASI KELUARGA DIKAWASAN TEPIAN SUNGAI MAHAKAM KOTA SAMARINDA |
Abstract
doc
|
PAR YONO |
|
Vol 4, No 2 (2014) |
PERBANDINGAN ANALISIS EKONOMI PERKERASAN ASPAL DAN BETON SEMEN PADA RUAS JALAN UNTUNG SUROPATI DI KOTA SAMARINDA |
Abstract
doc
|
ANGGA BAYU PUTRA BJ |
|
Vol 4, No 1 (2014) |
PERBANDINGAN ANTARA KONTRAK TAHUN TUNGGAL DAN KONTRAK TAHUN JAMAK |
Abstract
doc
|
FERRY FATHONI |
|
Vol 4, No 2 (2014) |
PERBANDINGAN BIAYA OPERASIONAL KENDARAAN PADA PEMILIHAN RUTE JALAN KELUAR DAN MASUK KOTA SAMARINDA |
Abstract
pdf
|
Muhammad Soleh |
|
Vol 1, No 2 (2013) |
PERBANDINGAN CAMPURAN AC-BC ASPAL BUTON CARA PANAS MENGGUNAKAN BAHAN LOKAL DARI KUTAI BARAT DAN MUARA WAHAU DENGAN PENAMBAHAN ANTI STRIPING (ANTI PENGELUPASAN) |
Abstract
doc
|
SUGENG MUJIONO |
|
Vol 1, No 1 (2018) |
PERBANDINGAN DESAIN ALTERNATIF PONDASI DALAM PADA PROYEK PEMBANGUNAN JEMBATAN FLY OVER SIMPANG AIR HITAM KOTA SAMARINDA |
Abstract
pdf
|
TAUFAN HARY SAPUTRA |
|
Vol 11, No 1 (2020) |
PERBANDINGAN DURASI WAKTU PROYEK KONSTRUKSI DENGAN METODE CRITICAL PATH METHOD (CPM) PADA PROYEK PEKERJAAN PEMBANGUNAN AULA LEMBAGA PENJAMIN MUTU PENDIDIKAN KOTA SAMARINDA KALIMANTAN TIMUR |
Abstract
pdf
pdf
|
MAYLAN MAYLAN |
|
Vol 12, No 1 (2021) |
PERBANDINGAN ESTIMASI ANGGARAN BIAYA ANTARA METODE SNI, BOW DAN KONTRAKTOR (STUDI KASUS : PROYEK LANJUTAN PEMBANGUNAN EKS GEDUNG KANTOR KOPERASI SAMARINDA) |
Abstract
doc
|
RISELDY YUSNA PUTRA |
|
Vol 4, No 1 (2014) |
PERBANDINGAN ESTIMASI ANGGARAN BIAYA ANTARA METODE SNI DAN BOW PADA PROYEK PEMBANGUNAN GEDUNG JOANG / LEGIUN VETERAN REPUBLIK INDONESIA SAMARINDA |
Abstract
PDF
|
ABD RAHMAN |
|
Vol 11, No 1 (2020) |
PERBANDINGAN ESTIMASI ANGGARAN BIAYA ANTARA METODE SNI DAN BOW PADA PROYEK PEMBANGUNAN GEDUNG KANTOR KESEHATAN RS.DIRGAHAYU SAMARINDA |
Abstract
pdf
|
LAMBI SAPANG MICHAEL |
|
Vol 4, No 1 (2014) |
PERBANDINGAN KECEPATAN RATA – RATA KENDARAAN DENGAN KECEPATAN ARUS BEBAS ( KAJIAN WILAYAH STUDI: JALAN ARTERI SLAMET RIYADI - SAMARINDA ) |
Abstract
doc
|
LA ADE |
|
Vol 11, No 2 (2020) |
PERBANDINGAN METODE PELAKSANAAN BETON KONVENSIONAL DENGAN PRA CETAK TERHADAP BIAYA DAN WAKTU (STUDI KASUS : PEKERJAAN DRAINASE PROYEK PEMBANGUNAN JALAN TOL BALIKPAPAN – SAMARINDA SEKSI 4) |
Abstract
pdf
|
RAJA CAINAWA |
|
Vol 1, No 1 (2017) |
PERBANDINGAN PELELANGAN PENGADAAN BARANG DAN JASA SECARA ELEKTRONIK BERDASARKAN ATURAN PERPRES RI NOMOR 70 TAHUN 2012 DAN PERPRES RI NOMOR 4 TAHUN 2015 DI KABUPATEN KUTAI KARTANEGARA TENGGARONG |
Abstract
pdf
|
MIRZA ACHMAD |
|
Vol 1, No 1 (2012) |
PERBANDINGAN PENANGANAN LONGSORAN DENGAN METODE RETAINING WALL DAN SEGMENTAL BLOK DITINJAU DARI EFEKTIFITAS WAKTU DAN BIAYA PADA RUAS JALAN SANGATTA – SIMPANG PERDAU |
Abstract
doc
|
YUDI PURWANTO |
|
Vol 4, No 1 (2014) |
PERBANDINGAN PERHITUNGAN DEBIT BANJIR DENGAN MENGGUNAKAN HIDROGRAF SATUAN SINTETIK NAKAYASU DAN HIDROGRAF SATUAN SINTETIK SNYDER PADA DAS LOKASI SUNGAI KARANG MUMUS PROVINSI KALIMANTAN TIMUR |
Abstract
pdf
|
AKHMAD JUNAIDI |
|
Vol 1, No 1 (2017) |
PERBANDINGAN PERILAKU LENTUR BALOK NORMAL DAN BALOK BETON DENGAN PENAMBAHAN FLY ASH 10 % & 15 % |
Abstract
pdf
|
INDRA DIAN WAHYUDI |
|
Vol 4, No 2 (2014) |
PERBANDINGAN RENCANA ANGGARAN BIAYA ANTARA METODE BOW DAN SNI PADA PEKERJAAN PERLUASAN GEDUNG LABORATORIUM BBPOM SAMARINDA |
Abstract
pdf
|
RIZKI NUR RAHMAN |
|
Vol 11, No 2 (2020) |
PERBANDINGAN RENCANA ANGGARAN BIAYA DENGAN METODE SNI DAN RENCANA ANGGARAN PELAKSANAAN KONTRAKTOR PADA PEMBANGUNAN PENGGANTI BANGUNAN DI YONIF 611/AWL KOMPI SENAPAN A DAN C DI SAMARINDA SEBERANG |
Abstract
pdf
|
FERNADO SOPACOA |
|
726 - 750 of 1243 Items |
<< < 25 26 27 28 29 30 31 32 33 34 > >> |