| Journal | Issue | Title | |
| KURVA MAHASISWA | Vol 1, No 1 (2018) | PERANCANGAN STRUKTUR DINDING PENAHAN TANAH PADA PEKERJAAN PENANGANAN LONGSORAN JALAN BATU CERMIN KOTA SAMARINDA | Abstract pdf |
| JUMA IDI | |||
| KURVA MAHASISWA | Vol 1, No 1 (2018) | PERANCANGAN STRUKTUR DINDING PENAHAN TANAH PADA RUAS JALAN BTS. KOTA TENGGARONG – SP.3 SENONI KABUPATEN KUTAI KARTANEGARA PROVINSI KALIMANTAN TIMUR | Abstract pdf |
| RUDI YANTO | |||
| KURVA MAHASISWA | Vol 1, No 2 (2013) | PERANCANGAN TAMAN REKREASI KELUARGA DIKAWASAN TEPIAN SUNGAI MAHAKAM KOTA SAMARINDA | Abstract doc |
| PAR YONO | |||
| KURVA MAHASISWA | Vol 1, No 2 (2013) | PERANCANGAN TAMAN REKREASI KELUARGA DIKAWASAN TEPIAN SUNGAI MAHAKAM KOTA SAMARINDA | Abstract doc |
| PAR YONO | |||
| JAP: Jurnal ADMINISTRASI PUBLIK | Vol 2, No 4 (2018) | PERANKOMUNIKASI LURAH DALAM MENINGKATKAN SEMANGAT KERJA PEGAWAI DI KANTOR KELURAHAN RAPAK DALAM KOTA SAMARINDA | Abstract doc |
| Widya Refidiana Pratama | |||
| Kurva S : Jurnal Keilmuan dan Aplikasi Teknik Sipil | Vol 8, No 2 (2020) | Perbaikan Alur Sungai dan Peningkatan Kapasitas Penampang Sungai untuk Pengendalian Banjir Pada Sungai Sempaja Kota Samarinda | Abstract PDF |
| Heri Purnomo | |||
| Kurva S : Jurnal Keilmuan dan Aplikasi Teknik Sipil | Vol 6, No 3 (2018) | Perbaikan Alur Sungai dan Peningkatan Kapasitas Penampang Sungai untuk Pengendalian Banjir Pada Sungai Sempaja Kota Samarinda | Abstract PDF |
| Heri Purnomo | |||
| Kurva S : Jurnal Keilmuan dan Aplikasi Teknik Sipil | Vol 13, No 1 (2025) | Perbaikan Tanah Pada Pekerjaan Perluasan Apron, Bandar Udara APT Pranoto, Samarinda | Abstract FULL TEXT |
| Eswan Eswan, A. Mahrus Efendi | |||
| RJABM (Research Journal of Accounting and Business Management) | Vol 5, No 2 (2021) | PERBAIKAN TATA LETAK PASAR INDUK TRADISIONAL DI SANGATTA DENGAN METODE MARKET BASKET ANALYSIS (MBA) | Abstract PDF PDF |
| Indra Wahyudi, Anwar Arifin | |||
| KURVA MAHASISWA | Vol 4, No 2 (2014) | PERBANDINGAN ANALISIS EKONOMI PERKERASAN ASPAL DAN BETON SEMEN PADA RUAS JALAN UNTUNG SUROPATI DI KOTA SAMARINDA | Abstract doc |
| ANGGA BAYU PUTRA BJ | |||
| KURVA MAHASISWA | Vol 4, No 1 (2014) | PERBANDINGAN ANTARA KONTRAK TAHUN TUNGGAL DAN KONTRAK TAHUN JAMAK | Abstract doc |
| FERRY FATHONI | |||
| JMA: JURNAL MANAJEMEN DAN AKUNTANSI | Vol 5, No 1 (2016) | PERBANDINGAN ANTARA LEASING DAN HUTANG BANK BAGI PERUSAHAAN CV. SUNGAI BERLIAN JAYA | Abstract PDF |
| Eka Agustriani Titin Ruliana, Rina Masithoh Hariyadi | |||
| KURVA MAHASISWA | Vol 4, No 2 (2014) | PERBANDINGAN BIAYA OPERASIONAL KENDARAAN PADA PEMILIHAN RUTE JALAN KELUAR DAN MASUK KOTA SAMARINDA | Abstract pdf |
| Muhammad Soleh | |||
| KURVA MAHASISWA | Vol 1, No 2 (2013) | PERBANDINGAN CAMPURAN AC-BC ASPAL BUTON CARA PANAS MENGGUNAKAN BAHAN LOKAL DARI KUTAI BARAT DAN MUARA WAHAU DENGAN PENAMBAHAN ANTI STRIPING (ANTI PENGELUPASAN) | Abstract doc |
| SUGENG MUJIONO | |||
| Kurva S : Jurnal Keilmuan dan Aplikasi Teknik Sipil | Vol 11, No 3 (2023) | Perbandingan Campuran Beton Dengan Menggunakan Agregat Halus Ex. Tenggarong Ex. Palu Dan Agregat Kasar Ex. Palu Dengan Cara Perendaman Dan Tidak Di Rendam | Abstract FULL TEXT |
| Haidir Rizkina, Habir Habir, Musrifah Tohir | |||
| KURVA MAHASISWA | Vol 1, No 1 (2018) | PERBANDINGAN DESAIN ALTERNATIF PONDASI DALAM PADA PROYEK PEMBANGUNAN JEMBATAN FLY OVER SIMPANG AIR HITAM KOTA SAMARINDA | Abstract pdf |
| TAUFAN HARY SAPUTRA | |||
| KURVA MAHASISWA | Vol 11, No 1 (2020) | PERBANDINGAN DURASI WAKTU PROYEK KONSTRUKSI DENGAN METODE CRITICAL PATH METHOD (CPM) PADA PROYEK PEKERJAAN PEMBANGUNAN AULA LEMBAGA PENJAMIN MUTU PENDIDIKAN KOTA SAMARINDA KALIMANTAN TIMUR | Abstract pdf pdf |
| MAYLAN MAYLAN | |||
| KURVA MAHASISWA | Vol 12, No 1 (2021) | PERBANDINGAN ESTIMASI ANGGARAN BIAYA ANTARA METODE SNI, BOW DAN KONTRAKTOR (STUDI KASUS : PROYEK LANJUTAN PEMBANGUNAN EKS GEDUNG KANTOR KOPERASI SAMARINDA) | Abstract doc |
| RISELDY YUSNA PUTRA | |||
| KURVA MAHASISWA | Vol 4, No 1 (2014) | PERBANDINGAN ESTIMASI ANGGARAN BIAYA ANTARA METODE SNI DAN BOW PADA PROYEK PEMBANGUNAN GEDUNG JOANG / LEGIUN VETERAN REPUBLIK INDONESIA SAMARINDA | Abstract PDF |
| ABD RAHMAN | |||
| KURVA MAHASISWA | Vol 11, No 1 (2020) | PERBANDINGAN ESTIMASI ANGGARAN BIAYA ANTARA METODE SNI DAN BOW PADA PROYEK PEMBANGUNAN GEDUNG KANTOR KESEHATAN RS.DIRGAHAYU SAMARINDA | Abstract pdf |
| LAMBI SAPANG MICHAEL | |||
| Kurva S : Jurnal Keilmuan dan Aplikasi Teknik Sipil | Vol 11, No 3 (2023) | Perbandingan Estimasi Rencana Anggaran Biaya (RAB) Antara Metode AHSP Dengan BOW Proyek Rekonstruksi Jalan Patung Lembuswana – Sebulu | Abstract FULL TEXT |
| Maria Trivonia Sedo Sina, Findia Findia, Achmad Jaya Adhi Nugraha | |||
| JMA: JURNAL MANAJEMEN DAN AKUNTANSI | Vol 2, No 1 (2013) | PERBANDINGAN EXPECTED RATE OF RETURN DENGAN RATE OF RISK DALAM MENILAI HARGA SAHAM PADA PT. UNILEVER INDONESIA,TBK | Abstract PDF DOC |
| Trina Dewi | |||
| KURVA MAHASISWA | Vol 4, No 1 (2014) | PERBANDINGAN KECEPATAN RATA – RATA KENDARAAN DENGAN KECEPATAN ARUS BEBAS ( KAJIAN WILAYAH STUDI: JALAN ARTERI SLAMET RIYADI - SAMARINDA ) | Abstract doc |
| LA ADE | |||
| JMA: JURNAL MANAJEMEN DAN AKUNTANSI | Vol 6, No 1 (2017) | Perbandingan Kinerja Bank Negara Indonesia Syariah Dengan Bank Negara Indonesia (Tbk) Konvensional Tahun 2010-2015 | Abstract PDF |
| Marhaban Elfreda Aplonia Lau, Rina Masithoh Haryadi | |||
| JMA: JURNAL MANAJEMEN DAN AKUNTANSI | Vol 12, No 1 (2023): April 2023 | PERBANDINGAN KINERJA KEUANGAN BANK RAKYAT INDONESIA DAN BANK NEGARA INDONESIA DIMASA PANDEMI COVID 19 | Abstract PDF |
| Sahroni1 , Mardiana2 , Rina Masithoh Haryadi3 | |||
| 4551 - 4575 of 6128 Items | << < 178 179 180 181 182 183 184 185 186 187 > >> | ||