| Journal | Issue | Title | |
| JMA: JURNAL MANAJEMEN DAN AKUNTANSI | Vol 2, No 1 (2013) | PERHITUNGAN HARGA POKOK PRODUKSI PADA CV. DESIGN KREASINDO SAMARINDA | Abstract PDF DOC |
| Kuat Sudrajat | |||
| JMA: JURNAL MANAJEMEN DAN AKUNTANSI | Vol 2, No 1 (2013) | PERHITUNGAN HARGA POKOK PRODUKSI PADA CV. LAS ETAM | Abstract PDF Doc |
| ogi Fauzaniey | |||
| KURVA MAHASISWA | Vol 1, No 2 (2013) | PERHITUNGAN JEMBATAN KOMPOSIT SUNGAI MUARA BELINAU CALCULATION OF COMPOSITE BRIDGE MUARA BELINAU RIVER | Abstract doc |
| RAFI RAHAYU | |||
| KURVA MAHASISWA | Vol 1, No 2 (2013) | PERHITUNGAN JEMBATAN OVERPASS PT.GUNUNG BARA UTAMA DI DESA JINGEN DANUM KECAMATAN DAMAI KABUPATEN KUTAI BARAT PROVINSI KALIMANTAN TIMUR | Abstract doc |
| ALPIAN SUTARDI | |||
| KURVA MAHASISWA | Vol 4, No 1 (2014) | PERHITUNGAN KAPASITAS PRODUKSI ALAT BERAT PADA KEGIATAN PENAMBANGAN PT. KAYAN PUTRA UTAMA SITE SEPARI DI KECAMATAN TENGGARONG SEBERANG | Abstract doc |
| ADI SUNYOTO | |||
| KURVA MAHASISWA | Vol 1, No 1 (2018) | PERHITUNGAN KEBUTUHAN AIR IRIGASI DAN POLA TANAM PADA DAERAH IRIGASI RAPAK OROS KUTAI BARAT | Abstract Doc |
| ABDUL RAHMAN | |||
| KURVA MAHASISWA | Vol 1, No 1 (2018) | PERHITUNGAN KEBUTUHAN AIR IRIGASI DAN POLA TANAM PADA DAERAH IRIGASI RAWA (DR) TANA LIA DENGAN LUAS AREAL 750 HA, KABUPATEN TANA TIDUNG, PROVINSI KALIMANTAN UTARA | Abstract pdf |
| LUTFIAN RAHMA | |||
| KURVA MAHASISWA | Vol 2, No 2 (2016) | PERHITUNGAN KEBUTUHAN AIR IRIGASI DAN POLA TANAM PADA DAERAH IRIGASI RAWA (DR) TANJUNG BUKA DENGAN LUAS AREAL 750 HA, KABUPATEN BULUNGAN, PROVINSI KALIMANTAN UTARA | Abstract Doc |
| AJI SURYANTO PUTRO | |||
| KURVA MAHASISWA | Vol 1, No 1 (2017) | PERHITUNGAN KEBUTUHAN AIR IRIGASI DAN POLA TANAM PADA DAERAH IRIGASI RAWA SALIM BATU DENGAN LUAS AREAL 350 HA, KABUPATEN BULUNGAN, PROVINSI KALIMANTAN UTARA | Abstract pdf |
| MUHAMMAD SANDI VADILLAH | |||
| KURVA MAHASISWA | Vol 1, No 1 (2017) | PERHITUNGAN KEBUTUHAN AIR IRIGASI PADA DAERAH IRIGASI RAWA MUARA ASA KABUPATEN KUTAI BARAT PROVINSI KALIMANTAN TIMUR | Abstract Untitled pdf |
| RIO WAHYU PRADITYA | |||
| KURVA MAHASISWA | Vol 1, No 1 (2018) | PERHITUNGAN KEBUTUHAN AIR UNTUK IRIGASI PADA DAERAH SESAYAP DENGAN LUAS AREAL 3000 HA KABUPATEN TANA TIDUNG,PROVINSI KALIMANTAN UTARA | Abstract pdf |
| WANDI NOVALIADI | |||
| Agrifor : Jurnal Ilmu Pertanian dan Kehutanan | Vol 22, No 2 (2023): Oktober 2023 | PERHITUNGAN KEBUTUHAN DAN PEMETAAN RUANG TERBUKA HIJAU DI KOTA BONTANG | Abstract PDF |
| Sabat Sandraria Lebang, Hari Siswanto, Ariyanto Ariyanto, Yosep Ruslim | |||
| KURVA MAHASISWA | Vol 1, No 2 (2013) | PERHITUNGAN KEBUTUHAN PENAMPANG DRAINASE JALAN SIMPANG TIGA TANJUNG DURUN TEPIAN TEBOR KEC. KOTA BANGUN KABUPATEN KUTAI KARTANEGARA | Abstract PDF |
| RUS DIANSYAH | |||
| KURVA MAHASISWA | Vol 1, No 2 (2013) | PERHITUNGAN KONTRUKSI DINDING PENAHAN TANAH PADA PROYEK PENINGKATAN STRUKTUR BADAN JALAN POROS BONTANG - SANGATTA 28 ± 850 PROVINSI KALIMANTAN TIMUR | Abstract doc |
| Adam Ardiansyah | |||
| KURVA MAHASISWA | Vol 4, No 1 (2014) | Perhitungan Landas Pacu (Run Way) Bandar Udara Sajau – Kabupaten Bulungan | Abstract doc |
| SETI AWAN | |||
| Agrifor : Jurnal Ilmu Pertanian dan Kehutanan | Vol 23, No 1 (2024): Maret 2024 | PERHITUNGAN NILAI EKONOMI POHON PADA LANSKAP JALAN DIPONEGORO KOTA SALATIGA MENGGUNAKAN METODE BURNLEY | Abstract PDF |
| Julio Lourdy Mulianandya, Alfred Jansen Sutrisno | |||
| KURVA MAHASISWA | Vol 4, No 1 (2014) | PERHITUNGAN PELAT BETON BERTULANG DENGAN BALOK – BALOK BERDASARKAN METODE PERENCANAAN LANGSUNG DAN METODE PORTAL EKIVALEN PADA PROYEK PEMBANGUNAN GEDUNG DISPERINDAG KOTA SAMARINDA | Abstract doc |
| DEDE SUDRAJAT | |||
| KURVA MAHASISWA | Vol 1, No 3 (2013) | PERHITUNGAN PELAT CENDAWAN BETON BERTULANG DENGAN METODE PERENCANAAN LANGSUNG DAN METODE PORTAL EKIVALEN PADA PROYEK PEMBANGUNAN GEDUNG DISPERINDAG KOTA SAMARINDA | Abstract doc |
| BERTOMILIUS RAPA | |||
| KURVA MAHASISWA | Vol 4, No 1 (2014) | PERHITUNGAN PELAT DATAR BETON BERTULANG DENGAN METODE PERENCANAAN LANGSUNG DAN METODE PORTAL EKIVALEN PADA PROYEK PEMBANGUNAN GEDUNG DISPERINDAG KOTA SAMARINDA | Abstract doc |
| WAHYU BASRI SUSILO | |||
| KURVA MAHASISWA | Vol 1, No 2 (2013) | PERHITUNGAN PEMINDAHAN TANAH MEKANIS PADA PEKERJAAN PEMATANAGN LAHAN PERUMAHAN PANORAMA ALAM ASRI II KEC. SUNGAI KUNJANG SAMARINDA | Abstract doc |
| MUHAJIR SORDIAN | |||
| JMA: JURNAL MANAJEMEN DAN AKUNTANSI | Vol 4, No 2 (2015) | PERHITUNGAN PEMOTONGAN PPh 21 PADA KARYAWAN KOPERASI JASA DIRGAHAYU MAJU SEJAHTERA DI SAMARINDA MENURUT UNDANG-UNDANG NOMOR 36 TAHUN 2008 | Abstract Untitled |
| Kristina Ugan LCA Robin Jonathan Eka Yudhyani | |||
| KURVA MAHASISWA | Vol 4, No 1 (2014) | PERHITUNGAN PERENCANAAN STRUKTUR BANGUNAN GEDUNG RUMAH SAKIT BAQA DI SAMARINDA DENGAN METODE TAKABEYA DAN SAP 2000 | Abstract doc |
| Fahrul Rizal | |||
| KURVA MAHASISWA | Vol 4, No 1 (2014) | PERHITUNGAN PERSIMPANGAN JALAN PANGERAN SURYANATA-JALAN H.M. ARDAN-RINGROAD DI KOTA SAMARINDA | Abstract Doc |
| RENDY RADITYO ARI | |||
| KURVA MAHASISWA | Vol 4, No 2 (2014) | PERHITUNGAN PRODUKSI ALAT BERAT PADA PEKERJAAN JALAN TALISAYAN KABUPATEN BERAU | Abstract doc |
| ISRA WAHYUDI PARHAN | |||
| Kurva S : Jurnal Keilmuan dan Aplikasi Teknik Sipil | Vol 4, No 2 (2016) | Perhitungan Produksi Alat Berat Pada Pek | Abstract PDF |
| Isra Wahyudi, Zony Yulfadli | |||
| 4876 - 4900 of 6081 Items | << < 191 192 193 194 195 196 197 198 199 200 > >> | ||